Escolator bollard installation
Client: Sydney Airport Corporation
Site: T1 International- P7 Carpark
Duration: 2 weeks
During
Completion
About the project
Our client identified issues with preexisting escalator landing space as it presented issues with traffic management and presented a hazard for foot traffic collisions.
Vegagroup was contracted to install two bollards at the start of the preexisting escalator.
Before installing, Vegaroup has to engage in slab scanning to decipher accurate dimensions of the slab to maintain the structural integrity of the bollards. Installation required slab drilling and concreting the bollards in.